• image
  • image
  • image
  • image
  • image

EXTREME MANUFACTURING COMPANY LTD

  • 30meters High Detergent Tower [About 1500 squares meter]
  • Ware Houses / Factory Tower [About 9000 Square Area] with Steel frame structure.
  • Administrative Block, 3 floors apartment [About 350 Square Area]
  • Workshop, Canteen block, Generator House Etc
  • Fence Work and Reinforced concrete Slab for the entire Factory Area
  • Weighing Bridge, GateHouse etc
  • Reinforced concrete Tank base with the steelwork
  • Internal Drainage [Reinforced Concrete structure]
  • Clock Room, Septic Tank, Soak pit etc.
  • Client: Extreme Manufacturing Company ltd
  • Architect: Peaktech First Continental Projects
  • Builder: Peaktech First Continental Projects